Increation bespoke interiors

Will I be totally disrupted whilst the work is being carried out?

We will try and minimize disruption as much as we can. It is usually the space preparation which can be the most disruptive. The design and manufacture will cause no disruption and the installation period only takes around a two weeks. However, it is only after the initial fitting that work tops and glass splash backs can be templated and manufactured. Granite, stone composite, stainless steel etc are bespoke items in their own right and have their own manufacture lead time after the first fix of your kitchen furniture.

Our Customers

“An excellent design which makes the best of limited space. We have been extremely pleased with the result”

Gilliam Empay